With ever-increasing labor and machinery costs, converters are finding it necessary to plan and prepare for installation as well as outline the general and specific details required to ensure a very effective and expedient flexo installation.
A first-rate installation does not ensure excellent productivity. However, a poor installation will guarantee poor performance, high maintenance costs, production bottlenecks, and possible excessive setup times, all of which will be "built in" for the life of the machine. Another by-product of a poor installation will be the negative attitude of the flexo operating personnel which could prove to be harder to correct than poor installation.
The following text will provide general guidelines for planning, and general and specific details for preparing and installing.
Document identifier
TAPPI TIP0305-12
TAPPI Category
Corrugated Containers
Publication date
2004-03-16
International Relationship
History of version
TAPPI TIP0305-12*TAPPI TIP0305-12 * TAPPI TIP0305-12 * TAPPI TIP0305-12 * TAPPI TIP0305-12
Price |
Contact |