Loading data. Please wait

ANS 3.5-2018

Nuclear Power Plant Simulators for Use in Operator Training and Examination

Pages: 35
Publication date: 2019-10-10
Price: 137 vnd

Add to cart
ANS 3.5-2018 establishes the functional requirements for full-scope nuclear power plant control room simulators that are subject to U.S. Nuclear Regulatory Commission regulation for use in operator training and examination. This standard also establishes criteria for the scope of simulation, performance, and functional capabilities of nuclear power plant control room simulators. This standard does not establish criteria for the use of simulators in training programs.
Document identifier
ANS 3.5-2018
Title
Nuclear Power Plant Simulators for Use in Operator Training and Examination
ANS Category
Standards 3 through 4.9
Publication date
2019-10-10
Status
Effective
International Relationship
Cross references
Latest version
ANS 3.5-2018
Nuclear Power Plant Simulators for Use in Operator Training and Examination
Document identifier ANS 3.5-2018
Publication date 2019-10-10
Classification
Status Effective
*
History of version
ANS 3.5-2018 * ANS 3.5-2009 * ANS 3.5-1998
Keywords
Classification
Pages
35
Price 137 vnd