Loading data. Please wait

IEEE 1827-2016

IEEE Guide for Electrical and Control Design of Hydroelectric Water Conveyance Facilities

Pages: 62
Publication date: 2017-03-31
Price: 77 vnd

Add to cart
New IEEE Standard - Active. Electrical and control design of water conveyance facilities associated with hydroelectric projects including associated penstocks, valves, and gates are described in this guide. Guidance to plan and prepare designs is included. Installation, peration, or maintenance guideline and methodologies are not included. Design of new facilities and rehabilitation or replacement of existing facilities is covered. Comprehensive considerations for design, monitoring, control, protection, and operation of water conveyance facilities associated with hydroelectric projects is provided. Guidance in electrical and instrumentation work unique to water conveyance systems is provided. Guidance for the safe control of water release systems, bypass systems, and failure modes are provided. Reliability measures such as redundancy and power source considerations are provided. Gate and valve types and associated operating mechanisms are introduced. Power and non-power water conduits including penstocks, tunnels, and canals are covered.
Document identifier
IEEE 1827-2016
Title
IEEE Guide for Electrical and Control Design of Hydroelectric Water Conveyance Facilities
IEEE Category
Power Generation
Publication date
2017-03-31
Status
Effective
International Relationship
Cross references
Latest version
History of version
Keywords
Pages
62
Price 77 vnd