Loading data. Please wait

CSA ANSI/CSA HGV 4.5-2012

Priority and sequencing equipment for hydrogen vehicle fueling

Pages: 27
Publication date: 2012-07-01
Price: Contact

Add to cart
Preface This publication represents a standard for requirements for priority and sequencing equipment, which is part of a hydrogen gas vehicle fueling system. Scope 1.1.1 These requirements apply to priority and sequencing equipment (see Part IV - Definitions) which is part of a hydrogen gas vehicle fueling system, hereinafter referred to as equipment. 1.1.2 Priority and sequencing equipment of a type not specifically addressed in these requirements may be subjected to such examinations and tests as deemed necessary by the testing agency to determine compliance with the intent of these requirements. 1.1.3 If a value for measurement, as given in these requirements, is followed by an equivalent value in other units, the first stated value is to be regarded as the specification.
Document identifier
CSA ANSI/CSA HGV 4.5-2012
Title
Priority and sequencing equipment for hydrogen vehicle fueling
CSA Category
Hydrogen Gas Vehicle and Fueling Installations
Publication date
2012-07-01
Status
Ineffective
International Relationship
Cross references
Latest version
CSA ANSI HGV 4.5-2013
History of version
CSA ANSI HGV 4.5-2013 [ Withdrawn ]*CSA ANSI/CSA HGV 4.5-2012 * CSA ANSI HGV 4.5-2013 * CSA ANSI/CSA HGV 4.5-2012
Keywords
Classification
Pages
27
Price Contact