Loading data. Please wait

ASME PCC-3-2007 (R2012)

Inspection Planning Using Risk-Based Methods, Includes Errata (2008)

Pages: 88
Publication date: 2008-01-01
Price: 98 vnd

Add to cart
The risk analysis principles, guidance, and implementation strategies presented in this Standard are broadly applicable; however, this Standard has been specifically developed for applications involving fixed pressure-containing equipment and components. This Standard is not intended to be used for nuclear power plant components; see ASME BPV, Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components. It provides guidance to owners, operators, and designers of pressure-containing equipment for developing and implementing an inspection program. These guidelines include means for assessing an inspection program and its plan. The approach emphasizes safe and reliable operation through cost-effective inspection. A spectrum of complimentary risk analysis approaches (qualitative through fully quantitative) should be considered as part of the inspection planning process.
Document identifier
ASME PCC-3-2007 (R2012)
Title
Inspection Planning Using Risk-Based Methods, Includes Errata (2008)
ASME Category
BPVC Related Standards, High Pressure Systems
Publication date
2008-01-01
Status
Ineffective
International Relationship
Cross references
Latest version
ASME PCC-3-2017
Inspection Planning Using Risk-Based Methods
Document identifier ASME PCC-3-2017
Publication date 2017-12-28
Classification
Status Effective
*
History of version
ASME PCC-3-2017*ASME PCC-3-2007 (R2012) * ASME PCC-3-2017 * ASME PCC-3-2007 (R2012)
Keywords
Classification
Pages
88
Price 98 vnd